STRUCTURAL STUDY FOR SAR’S ELECTRICAL SUBSTATION

TTI - TECHNIP ENERGIES - LA SAR

STRUCTURAL STUDY FOR SAR’S ELECTRICAL SUBSTATION 

2020-2021

 

Complete study of the concrete and steel structure, main and secondary structure of the 6.3 MVA substation 

  • Design notes for main structure and connections;
  • Design notes for secondary structure;
  • MTO;
  • Overall drawings;
  • Detail and overall drawings.

Client: TTI- Technip Emergies- La SAR

FUEL STORAGE TANK 4'700M3
TTI - TECHNIP ENERGIES - LA SAR